Fairfield IOC Data Center

The project included replacement of two existing UPS units with four new 750kVA UPS modules configured into an A and B system set up. UPS modules were pre-assembled off site on steel skids reducing cutover time by 65%. The facility was further upgraded with the replacement of two 550 ton variable speed screw chillers and associated valves, the addition of a new 1680 GPM induced draft cooling tower and two new 1500kW diesel generators and one 1000kW diesel generator including new switchgear.


Location: Fairfield
Engineer: Alfa Tech Cambridge Group 
Project Size: 50,000 SF