San Carlos HVAC/
Seismic Upgrade

This project included the selective demolition and replacement of (2) 80-ton chilled water air handler units within the mechanical penthouse of the PG&E San Carlos Service Center, as well as structural upgrades to the roof diaphragm. The client was very pleased that CB2 was able to perform all work with no disruption to the tenant's air supply needs during business hours. Structural upgrades included new installation of steel collector plates, tie rods and hold downs.

“[CB2 Builders has] been great in dealing with everything associated with the project whether it be small or large. Very professional all around.”
-- client

Location: San Carlos
Engineer:
Structural - Degenkolb Engineers
Mechanical - Aire Sheetmetal, Inc. 
Size: 51,000 SF